Skip Ribbon Commands
Skip to main content

Case Study

JLL leads award-winning construction of EMD Serono facility

​JLL performed the award-winning ground-up construction of EMD Serono’s $65M, 140,000-square-foot LEED Gold Certified Research Facility in Billerica, MA.

The work included extensive structural upgrades and enhancement to the existing structure, as well as increasing the building’s footprint with a new ground-up expansion.

The new building was connected to a 54,000-square-foot laboratory on campus, which was fully operational during construction. As always, safety was a top priority for JLL and this project saw 370,000 hours of work without a single recordable loss-time accident.

The work earned the team numerous awards including: BBJ - Best Green Practices, IFMA - Best Workplace, and CoreNet - New Construction.

EMD 1.jpg 

emd3.jpg 

emd4.jpg 

Learn more about our Construction services.

All case studies

 

 

Orange Regional Medical Center/united-states/en-us/case-studies/510/orange-regional-medical-centerOrange Regional Medical CenterA campus expansion plan that encompasses an owner constructed and financed, new physician office building incorporating an ambulatory care center, along with an attached but separate cancer center addition and renovation. A consolidation and enhancement of outpatient care services on the Main Campus, for a collaborative and interdisciplinary approach for outpatient diagnostic and treatment services.
UCSF Benioff Children’s Hospital Oakland/united-states/en-us/case-studies/511/ucsf-benioff-childrens-hospital-oaklandUCSF Benioff Children’s Hospital OaklandUCSF Benioff Children's Hospital was designed in 3 separate zones: patient, caregiver and family, ensuring that “family centered” concepts were followed.
NetScout/united-states/en-us/case-studies/512/netscoutNetScoutNetScout was dealing with surplus space in their corporate office and interested in finding a more efficient solution. So JLL's Tenant Representation team jumped into action.