​JLL developed a 2-step screening process including usage sizing and screening sizing, compared the two, and used the minimum value as the site's potential. JLL ran multiple bids that lead to the final selection of a single vendor that agreed to sell power at a discount, significantly lower than initially anticipated.

Through this process, JLL helped the client secured a 20 year Power Purchase Agreement for 97.5 million kWh/year. This is enough electricity to power 16.2K homes. In year one, energy savings were nearly $3 million, around 15% lower than a typical utility bill would have been.

All case studies

 

 

Orange Regional Medical Center/united-states/en-us/case-studies/510/orange-regional-medical-centerOrange Regional Medical CenterA campus expansion plan that encompasses an owner constructed and financed, new physician office building incorporating an ambulatory care center, along with an attached but separate cancer center addition and renovation. A consolidation and enhancement of outpatient care services on the Main Campus, for a collaborative and interdisciplinary approach for outpatient diagnostic and treatment services.
UCSF Benioff Children’s Hospital Oakland/united-states/en-us/case-studies/511/ucsf-benioff-childrens-hospital-oaklandUCSF Benioff Children’s Hospital OaklandUCSF Benioff Children's Hospital was designed in 3 separate zones: patient, caregiver and family, ensuring that “family centered” concepts were followed.
NetScout/united-states/en-us/case-studies/512/netscoutNetScoutNetScout was dealing with surplus space in their corporate office and interested in finding a more efficient solution. So JLL's Tenant Representation team jumped into action.