Skip Ribbon Commands
Skip to main content

Case Study

Masonite International Corporation

Services
Tenant Representation

Situation/Process

  • Masonite, a leading manufacturer of doors, was operating out of a production and distribution facility that lacked the capacity or operational efficiencies to support the company’s business growth.
  • The company required a modern, efficient building with more dock doors, greater trailer storage capability and higher ceiling clear heights for improved product racking. Additionally, Masonite had set specific economic parameters that had to be met in order to justify a move.
  • We prepared a detailed evaluation of available properties for lease and analyzed key costs that would impact the company’s decision, including the costs associated with transportation, labor and new material handling equipment, as well as the cost of the move itself.

Results

  • After studying suitable space options and ancillary moving costs, we identified a facility in Lawrenceville, Ga., that offered greater capacity and improved operational efficiencies. Masonite leased 220,000 square feet in a state-of-the-art 4000,000-square-foot distribution facility.
  • Masonite moved into upgraded space and purchased a new pallet racking system without exceeding its existing budget.

*The work performed in this case study was completed by Ray Dankberg prior to his employment with Jones Lang LaSalle in 2010.

All case studies

 

 

Orange Regional Medical Center/united-states/en-us/case-studies/510/orange-regional-medical-centerOrange Regional Medical CenterA campus expansion plan that encompasses an owner constructed and financed, new physician office building incorporating an ambulatory care center, along with an attached but separate cancer center addition and renovation. A consolidation and enhancement of outpatient care services on the Main Campus, for a collaborative and interdisciplinary approach for outpatient diagnostic and treatment services.
UCSF Benioff Children’s Hospital Oakland/united-states/en-us/case-studies/511/ucsf-benioff-childrens-hospital-oaklandUCSF Benioff Children’s Hospital OaklandUCSF Benioff Children's Hospital was designed in 3 separate zones: patient, caregiver and family, ensuring that “family centered” concepts were followed.
NetScout/united-states/en-us/case-studies/512/netscoutNetScoutNetScout was dealing with surplus space in their corporate office and interested in finding a more efficient solution. So JLL's Tenant Representation team jumped into action.