Strident program management provides $6.5 million in savings to critical care to hospital expansion

Challenge

  • Deliver a highly-specialized 232-bed, 367,000 square foot inpatient expansion on time and within budget
  • Overcome potential disruption when a construction team member leaves midway through the project
  • Accommodate several client changes without cost ramp-up

Solution

  • Developed and implemented a proven documentation and auditing policy and system
  • Facilitated a cooperative and collaborative environment for all stakeholders that helped weather challenges
  • Created full-size room mockups early on to visualize the project to clients and help reduce costly late-stage changes

Results

  • Produced over $6.5 million added value savings and delivered project $6 million under budget despite several client upgrades
  • Delivered the expansion on time despite departure of construction team member and multiple changes
  • Fostered a collaborative environment and mockups to support and buy-in from VCUHS clinicians

"Jones Lang LaSalle has been effective in keeping the job on schedule and on budget. I am very impressed with the competence they bring to a job. The value they add because of those two things – professionalism and process for controlling the budget and schedule – make them a provider of choice for us.” Bob Reardon Chief Facilities Officer Virginia Commonwealth University Health System

“Our critical care hospital has been a challenging project. From site issues to escalating construction costs, the challenges have been numerous. Jones Lang LaSalle has done an excellent job overcoming these challenges and leading our design and construction teams with a letter perfect project manager process and plan.” Darrell Johnson Vice President, Support and Professional Services Virginia Commonwealth University Health System

For more information contact: Mark Ahern +1 804 828 5985 mark.ahern@am.jll.com

All case studies

 

 

Orange Regional Medical Center/united-states/en-us/case-studies/510/orange-regional-medical-centerOrange Regional Medical CenterA campus expansion plan that encompasses an owner constructed and financed, new physician office building incorporating an ambulatory care center, along with an attached but separate cancer center addition and renovation. A consolidation and enhancement of outpatient care services on the Main Campus, for a collaborative and interdisciplinary approach for outpatient diagnostic and treatment services.
UCSF Benioff Children’s Hospital Oakland/united-states/en-us/case-studies/511/ucsf-benioff-childrens-hospital-oaklandUCSF Benioff Children’s Hospital OaklandUCSF Benioff Children's Hospital was designed in 3 separate zones: patient, caregiver and family, ensuring that “family centered” concepts were followed.
NetScout/united-states/en-us/case-studies/512/netscoutNetScoutNetScout was dealing with surplus space in their corporate office and interested in finding a more efficient solution. So JLL's Tenant Representation team jumped into action.